Clearwater International – London

A D&B project by Saracen Interiors the work included the reconfiguration of meeting rooms, including the creation of a centralised and circular meeting room built from curved glass partitions to reflect the company logo; the installation of new floors and ceilings; new furniture; the design and fit of an open plan kitchen and breakout area and the installation of a new air conditioning system. The fit-out timeline was a period of 6 weeks.

Office Design and Fit Out

7,000 M2

Facebook
Twitter
LinkedIn

Portfolio

Firstsource Wales – Pontypridd

The project involved the CAT B -fit out of the ground and first floors of the building, making it suitable for the clients’ very specific

Clearwater International – London

A D&B project by Saracen Interiors the work included the reconfiguration of meeting rooms, including the creation of a centralised and circular meeting room built

Audatex Theale Reading

A Design and Build by Saracen completely stripping and refitted 10,000 square metres of commercial space in Reading for the risk and asset management software

Tata Communications London

The turnkey project comprised the full fit out of the South East wing on the second floor of the building. Work to the reception area